July 17, 2015

Iron Ore Holdings Office Fit Out

Iron Ore Holdings fit out was another operational install, that is the job was constructed as the office was still functioning. Lighting was relocated and installed mainly using fluorescent troffer fittings with some additional highlights with LED down lights. Power for the desks was completed using both fixed wiring and soft wiring, supplied by CMS Electracom, which included the cabling and wiring system, as well as the cable support cages under the desks. A digital projector system is installed in the boardroom, with digital light switching to enhance the displayed images on the screen.

Commercial Electrical Advice